What do the inspection sequences mean?
All inspections with a 10 sequence need to be approved before the computer will allow inspections with a 20 sequence. A 999 sequence can be scheduled anytime the inspection is ready. All required inspections 10’s, 20’sand 999’s need to be approved before calling the final which has a 1000 sequence.

Show All Answers

1. What do the inspection sequences mean?
2. How do I know if I need a certain inspection?
3. What is a CO/CC compliance check? Should I wait for the inspector? Can I call it in with building final?
4. How do I schedule my inspection?