Current and Upcoming Road Closures

List of Road Closures

Table stating the dates, times and locations for current and upcoming road closures around Boca Raton. More details about these road closures can be found below.
Dates Times Location
Full or Partial
Notes
Ongoing
9am - 4pm
NW 2nd Ave
Partial Ongoing work
September 23 -
September 27
9am - 4pm
Mizner Blvd
Partial Installing irrigation system, WM tapping &
connecting fire hydrant
September 9 -
October 4
9am - 4pm
NW 2nd Ave
Partial Between Glades Rd and Yamato Rd
September 16 -
September 20
9am - 4pm
Mon - Fri
NW Spanish River Blvd at
NW 3rd Avenue
Partial Westbound / Eastbound left lane closures on
Spanish River for work in median
September 18
Night Dixie Hwy from S of SW 18th St
to Glades Rd
Partial Approximate work duration of 20 days. This
will be night time operations with temporary
lane closures
August 12 -
early 2020
See below
Spanish River Blvd Bridge
over Intracoastal
Partial Single lane closures are permitted daily
and nightly, Monday through Sunday,
with exceptions
Oct 5 - Oct 7
5am Oct 5 -
5am Oct 7
Spanish River Blvd Bridge
over Intracoastal
Full Eastbound lanes
See the Bridge Closure Flyer (PDF)
Oct 12 - Oct 14
5am Oct 12 -
5am Oct 14
Spanish River Blvd Bridge
over Intracoastal
Full Eastbound lanes
See the Bridge Closure Flyer (PDF)
Oct 19 - Oct 21
5am Oct 19 -
5am Oct 21
Spanish River Blvd Bridge
over Intracoastal
Full
Westbound lanes
Oct 26 - Oct 28
5am Oct 26 -
5am Oct 28
Spanish River Blvd Bridge
over Intracoastal
Full
Westbound lanes

Pavement Resurfacing

All County Pavement Management Solutions will be working on NW 2nd Ave between Glades Rd and Yamato Rd milling and resurfacing project. Contractor will commence this project on Monday September 9 through Friday, October 4, 2019. Approved lane closures will be permitted between the hours of 9am - 4pm, Monday through Friday.

Palm Beach County

Old Dixie Highway from south of SW 18th Street to Glades Road will be resurfaced. Tentative start date is Wednesday, September 18 (weather and schedule permitting) with an estimated work duration of approximately 20 days. This will be night time operations with temporary lane closures.

For information and requests please contact Palm Beach County Engineering & Public Works at 561-684-4012 or ENG-ActionCenter@pbcgov.org. You can also contact Construction Project Manager Mark Kroeger at 561-233-3962.

Spanish River Boulevard Bridge Painting

Starting August 12, 2019 with an estimated completion date in early 2020, the Spanish River Blvd Bridge over the Intracoastal will experience lane closures. Scope of work includes sandblasting the existing paint and repainting the steel bridge structure, repairing and rehabilitating the bridge span locks, and replacing the bridge piling jackets. Single lane closures are permitted daily as follows:

  • Lane closures may occur daily and nightly, Monday through Sunday, with the following exceptions:
    • Westbound lane closures are not permitted 7am - 9am
    • Eastbound lane closures are not permitted 2:30pm - 7pm

The plans also allow for four (4) weekends of full closures so the bridge may be locked in the upright position. The dates for these closures are not confirmed at this time.

Full Weekend Bridge Closures for October, weather permitting:

View the Spanish River Blvd Bridge October Bridge Closures (PDF) flyer.

  • Full closures may begin at 5am Saturday morning, ending by 5am the following Monday morning.
    • The eastbound lanes are expected to be closed:
      • 5am Saturday, October 5, until 5am Monday, October 7
      • 5am Saturday, October 12, until 5am Monday, October 14
    • The westbound lanes are expected to be closed:
      • 5am Saturday, October 19, until 5am Monday, October 21
      • 5am Saturday, October 26, until 5am Monday, October 28
    • Motorists may detour northbound via Linton Boulevard
    • Motorists may detour southbound via Palmetto Park Road
    • Pedestrian and first responder access will be maintained at all times
    • Should inclement weather affect operations, the closure will be rescheduled for the following weekend until completed

Road Work

Stay tuned for more information on road work.

FPL Pole Replacement Project

FPL will be replacing existing concrete poles and topping existing poles throughout the Downtown area and thoughout the City. They are also working in manholes splicing and pulling cable.

For any additional questions, please contact FPL Media Relations at 561-694-4442 or email Media.Relations@FPL.com

I-95 EXPRESS LANES - FDOT PROJECT from SW 10th Street to south of Glades Rd.

I-95 Traffic Impacts

I-95 will have three lanes closed in each direction nightly, as needed, Sunday through Thursday, between SW 10th Street and Glades Road, with the first lane closing at 9:30pm, the second lane closing at 10:30pm, and the third lane closing at 11:30pm until 5:30am.

Road Closure: I-95 southbound lanes at Palmetto Park Road will be closed to traffic overnight Sunday night, August 11 through Tuesday night, August 13 for overhead road work north of the SW 18th Street overpass. The first lane will close at 9:30pm, the second lane will close at 10:30pm, the third lane will close at 11:30pm, and all lanes will be closed by 11:59pm, reopening at 5:30am. Traffic will be detoured via the I-95 southbound exit ramp to Palmetto Park Road, Military Trail and Hillsboro Boulevard. FHP will be on site to assist motorists.

See map of the August 11 - 13 Road Closure.

Palmetto Park Road Traffic Impact

 As part of the I-95 Express Phase 3B-1:

  • Palmetto Park Road at I-95 will have two lanes closed in each direction nightly, as needed, Sunday through Thursday. The first lane will close at 9 p.m., and the second lane will close at 10:30 p.m. All lanes will be opened by 5:30 a.m.
  • Palmetto Park Road at I-95 will have one lane closed in each direction daily, as needed, 9:30 a.m. until 3:30 p.m., Monday through Friday.

Camino Real Traffic Impacts

  • Camino Real at I-95 will have one lane closed in each direction daily, as needed, 9:30 a.m. until 4 p.m., Monday through Friday.

Ramp Impacts

  • Ramp Closure: The I-95 southbound ramp at Palmetto Park Road will be closed nightly August 11 - 13 from 9pm to 5:30am.
  • The I-95 northbound exit ramp to Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via I-95 northbound, Hillsboro Boulevard, and Military Trail. FHP will be on site to assist motorists.
  • The I-95 southbound entrance ramp from westbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Hillsboro Boulevard. FHP will be on site to assist motorists.
  • The I-95 southbound entrance ramp from eastbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Motorists will be detoured via Military Trail and Hillsboro Boulevard. FHP will be on site to assist motorists.
  • The northbound entrance ramp from eastbound and westbound Palmetto Park Road will be closed nightly, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via I-95 southbound to Hillsboro Boulevard to I-95 northbound.