Current and Upcoming Road Closures
Last Content Update:
FDOT Projects
Boca Inlet - Northbound & Southbound
- Agency: FDI Services / FDOT
- Proposed Start / End Date: 12/14/23
- Hours of Work: 8am - 4pm
- Scope of Work: Electrical installation for camera system
- Partial lane closure going both northbound and southbound
Project Notes
- Control Devices may need to be adjusted to fit field conditions.
- The scheduled work can be affected by the weather.
- Site Contact will be Claudio Marques (954) 955-6195.
Advanced Transportation Management System (ATMS) Project
SR 5 / US 1 from the Broward/Palm Beach County line to SR 794 / Yamato Rd. and along SR 794 / Yamato Rd from SR 5 / US 1 to SR 9 / I-95
Additional information available on FDOT's project webpage.
- Agency: FDOT, The Corradino Group
- Proposed Start / End Date: July 31, 2023 - Summer 2024
- Hours of Work:
- SR 5 / US1 from 10:00pm until 6:30am
- `SR 794 / Yamato Road from 11:00pm until 7:00am
- Type of Closure: Single Lane Closures (There will be NO lane closures from 7/31/23 - 8/11/23.)
- Project Improvements:
- Installing a new fiber optic network
- Installing Intelligent Transporation Systems (ITS) devices including Closed-Circuit Television (CCTV) cameras controlled by wireless network devices. CCTV will be installed at 8 intersections on US 1 from Royal Palm Way to Spanish River Blvd.
- Installing Bluetooth travel time devices from US 1 from Royal Palm Way to Spanish River Blvd.
- Upgrading the Advanced Traffic Management System (ATMS) for compatibility with the Traffic Management Center (TMC).
- Traffic Impacts:
- Construction will occur in phases to minimize impacts to the public.
- Single lane closures are allowed nightly Monday through Sunday at the following locations:
- SR 5 / US1 from 10:00pm until 6:30am
- SR 794 / Yamato Road from 11:00pm until 7:00am
- Night-time intersection detours will be required to install Bluetooth travel time devices; advanced notice will be provided with motorist and pedestrian detours clearly marked.
- Access to businesses, residences, driveways, and bus stops will be maintained at all times.
- Contacts:
- Michael Miller, Project Manager: 954-815-2151
- Ricky Estripeaut, Project Administrator: 561-370-1132
- Melissa Readling, Community Outreach Specialist: 772-577-8803 or [email protected]
I-95 EXPRESS LANES - FDOT PROJECT from south of Glades Rd to south of Linton Blvd
Additional information including updated traffic restrictions, progress photos and detour flyers are available on the FDOT project page.
- Agency: FDOT
- Proposed Start / End Date: 11/7/19 - Late 2023
- Hours of Work: Ongoing | View closures for specific hours
- Type of Closure: Partial & Full Closures
- Scope of Work: 95 Express Lanes Phase 3B-2 will extend the existing Express Lanes north from just south of Glades Road to south of Linton Boulevard in Palm Beach County. One lane will be added and the High Occupancy Vehicle (HOV) lane will be converted to create two Express Lanes in each direction; the number of General Use lanes will remain the same. Access to the Express Lanes will be provided via two designated ingress and egress locations—between Glades Road and Spanish River Boulevard and between Yamato Road and Linton Boulevard. The scope of work includes reconfiguration of the SR 808/Glades Road Interchange to a Diverging Diamond Interchange (DDI). Additional project improvements include overhead sign structure installation, Intelligent Transportation System (ITS) and Express Lane markers, new signalization, lighting, signing and pavement markings and ramp signalization at five interchanges from Glades Road to Linton Boulevard. Shoulder-mounted sound barrier walls will be constructed along I-95 northbound between Clint Moore Road and Linton Boulevard, ground-mounted sound walls will be installed on the south side of Yamato Road east of I-95 adjacent to the University Heights Community and along I-95 northbound south of Linton Boulevard adjacent to the Tierra Verde Community. The Clint Moore Road Bridge over I-95 will be fully reconstructed and the Glades Road bridge over the South Florida Regional Transportation Authority (SFRTA) railroad tracks and Military Trail and the I-95 bridge over the C-15 Canal (between Peninsula Drive and Linton Boulevard) will be widened.
The Glades Road DDI at I-95 opened in the final configuration on April 3, 2023 – almost a month ahead of the original projected completion date of May 1, 2023.
Diverging Diamond Interchange (DDI) Implementation
- The final configuration features 4 westbound lanes and 4 eastbound lanes, including a dedicated and dual/through turn lane to the I-95 northbound entrance ramp.
- Please be aware that daily off-peak lane closures within the DDI area may still be required to finalize grading, sod placement, pond excavation, pull box adjustments, and drainage within the pond areas.
- Nightly lane closures will also occur as needed for placement of thermoplastic elements.
- All outstanding items are scheduled to be completed by May 1, 2023.
- FDOT’s Traffic Operations team will continue to work closely with the City of Boca’s Traffic Management Center and Traffic Engineering division to observe and optimize signal timing.
For the most recent closures, visit FDOT's project webpage.
Ramp Impact
- The I-95 northbound entrance ramp from westbound Glades Road will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via westbound Glades Road, Jog Road, and Yamato Road. FHP will be on site to assist motorists.
- The I-95 northbound entrance ramp from eastbound Glades Road will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via eastbound Glades Road, N Federal Highway, and Yamato Road. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramp from westbound Glades Road will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via westbound Glades Road, Powerline Road, and Palmetto Park Road. FHP will be on site to assist motorists.
- The I-95 southbound entrance from eastbound Glades Road will be closed as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via eastbound Glades Road, US-1/Federal Highway and Palmetto Park Road.
- The I-95 northbound exit ramp to Spanish River Boulevard will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via I-95 north, Yamato Road east, N Federal Highway, and Spanish River Boulevard. FHP will be onsite to assist motorists.
- The I-95 northbound entrance ramp from Congress Avenue and Peninsula Corp. Drive will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via southbound I-95 and Yamato Road. FHP will be on site to assist motorists.
- The I-95 northbound exit ramp to Yamato Road will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Congress Avenue/Peninsula Corp Drive, Congress Avenue, and Yamato Road. FHP will be on site to assist motorists.
- The I-95 southbound exit ramp to Yamato Road/Spanish River Blvd will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Peninsula Corp Dr, Congress Ave. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramp from eastbound Yamato Road will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via eastbound Yamato Road, US-1/Federal Highway south, westbound Glades Road, and the I-95 southbound entrance ramp from Glades Road. FHP will be on site to assist motorists.
- The I-95 southbound entrance ramp from westbound Yamato Road will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via westbound Yamato Road, Congress Ave, Peninsula Corp Drive, and the I-95 southbound entrance ramp from Peninsula Corp Drive. FHP will be on site to assist motorists.
Yamato Road Impact
- Eastbound Yamato Rd. at I-95 will have one outside lane closed as needed, 9:30am until 4pm, Monday through Friday.
- Westbound Yamato Rd. at I-95 will have one outside lane closed as needed, 9:30am until 4pm, Monday through Friday.
Glades Road / Diverging Diamond Interchange (DDI) Activities
For the latest updates on the Glades Road/I-95 Diverging Diamond Interchange (DDI) visit: https://www.d4fdot.com/pbfdot/glades_road_diverging_diamond_interchange.asp
- Agency: FDOT
- Proposed End Date: Late January 2023
- Type of Closure: Full closure, partial closure
- Scope of Work: Glades Road Diverging Diamond Interchange
The Glades Road DDI at I-95 opened in final configuration on Monday morning, April 3, 2023 – almost a month ahead of the original projected completion date of May 1, 2023.
Diverging Diamond Interchange (DDI) Implementation
- The final configuration features 4 westbound lanes and 4 eastbound lanes, including a dedicated and dual/through turn lane to the I-95 northbound entrance ramp.
- Please be aware that daily off-peak lane closures within the DDI area may still be required to finalize grading, sod placement, pond excavation, pull box adjustments, and drainage within the pond areas.
- Nightly lane closures will also occur as needed for placement of thermoplastic elements.
- All outstanding items are scheduled to be completed by May 1, 2023.
- FDOT’s Traffic Operations team will continue to work closely with the City of Boca’s Traffic Management Center and Traffic Engineering division to observe and optimize signal timing.
Public Meetings
FDOT held public meetings to help educate drivers on the new interchange. View the recording the virtual meeting on January 19.
Yamato Rd - Resurfacing, Restoration & Rehabilitation Project
Yamato Rd from east of I-95 to Federal Hwy
For the latest updates on the project visit:
FDOT Palm Beach County Construction - State Road 25 Safety Improvements Project (d4fdot.com)
- Agency: FDOT
- Proposed Project Dates: Fall 2024 - Fall 2025
- Type of Closure: Temporary lane closures
- Scope of Work:
- Repave and restripe the existing roadway within the project limits
- Upgrade non-compliant Americans with Disabilities Act (ADA) curb ramps along existing sidewalk
- Replace traffic signal mast arms at NW 2nd Ave
- Upgrade roadway lighting to illuminate pedestrian crosswalks at NW 2nd Ave & N Dixie Hwy
- Upgrade pedestrian signal heads with new LED countdown signals at NW 2nd Ave & N Dixie Hwy
- Upgrade signage and pavement markings
- Construction Impacts:
- Work will be done in phases to reduce the effects of construction to the community
- Temporary lane closures to build the improvements will be completed during non-peak hours
- Night work will be allowed
- Pedestrian traffic will be maintained at all times
- Access to properties adjacent to the corridor will be maintained during construction
- Contact Information:
- Helen James, P.E. - FDOT Project Manager
- 954-777-4346
- [email protected]
Spanish River Blvd Over the Instracoastal Waterway Bridge Maintenance Project
Eastbound & Westbound Spanish River Blvd
Additional information available on FDOT's project webpage.
Whole Project
- Proposed Start / End Date: 11/22/23 - Fall 2024
- Project Improvements:
- Protecting the bridge from erosion on the eastbound & westbound Spanish River Blvd bridges.
- Maintaining strength and carrying capacity.
- Ensuring a long-lasting life for both bridges.
- Construction Impacts:
- Work will be done in the ICWW under the bridges. Marine traffic will be maintained at all times.
- Temporary lane closures on the frontage road during non-peak hours in order to minimize effect on traffic.
- Access to properties along the frontage road will be maintained throughout construction.
- Marine Impacts:
- Half-channel closures can be expected during construction operations. Boater access will be maintained at all times.
- Contacts:
- Helen James, Project Manager:
- 954-777-4346 or 866-336-8435 (ext. 4346)
- [email protected]
A1A - Resurfacing, Restoration & Rehabilitation Project
A1A / North Ocean Drive from SE 31 Street to South of Grand Court
Public Meeting: 11/15/23
To view a recording of the meeting, please click on the link below. You will be directed to the YouTube page of the Florida Department of Transportation where you can view the presentation in its entirety.
If you have not already done so, we would appreciate you completing the below comment form and provide feedback about the project and presentation. All comments and questions submitted for this meeting are part of the public record and will be considered by the Department during project decision-making. The public comment period will remain open through November 25, 2023.
- Project information is posted at: https://tinyurl.com/447661-1-SRA1A-Project
- Click here to view the recording: https://youtu.be/SKhav6nvKhM
- To submit a comment, click here: https://survey.zohopublic.com/zs/XQCC1a
For the latest updates on the project visit:
FDOT Palm Beach County Construction - SR A1A from SE 31 Street to South of Grand Court (d4fdot.com)
- Agency: FDOT
- Proposed Project Dates: Fall 2027 - Fall 2028
- Type of Closure: Temporary lane closures
- Scope of Work:
- Milling and resurfacing the existing travel lanes, shoulders, and adjacent asphalt path to preserve the pavement service life.
- Narrowing the existing travel lanes from 12-feet to 11-feet, and widening existing paved shoulders less than 4-feet, to provide a continuous 6-foot bicycle facility to improve safety for bicyclists
- Increasing the width of the two-way left turn lane from 10-feet to 11-feet by reducing the adjacent travel lanes from 11.5-feet to 11-feet (5-foot bicycle lanes will be provided where the two-way left turn lane is present)
- Updating deficient curb ramps/detectable warning surfaces to comply with ADA and installing a new sidewalk along the east side from the beginning of the project to the intersection of Camino Real to facilitate safety for pedestrians with disabilities
- Improving access to bus stops and adding landing pads where missing to improve connectivity to transit
- Adding new signalization and lighting at the intersections of Camino Real and Spanish River Boulevard to improve the visibility of pedestrians and bicyclists for drivers at the intersection
- Replacing corridor-wide substandard signing and pavement markings
- Replacement of existing French drain exfiltration systems in front of the Marbella Condominium at 250 S Ocean Boulevard to eliminate localized flooding on both sides of SR A1A
- Replacing deficient guardrail sections to improve their crash-shielding capabilities
- Construction Impacts:
- Work will be done in phases to reduce the effects of construction on the community
- No construction will be allowed during weekends
- Access to properties adjacent to the corridor will be maintained throughout construction
- Pedestrian and bicyclist detours will be provided to maintain access through the work zone
- Contact Information:
- Henry Oaikhena, P.E. - FDOT Project Manager
- 954-777-4445
- [email protected]
Palm Beach County Projects
Palmetto Park Road El Rio Canal Bridge
- Agency: Palm Beach County
- Proposed End Date: Late 2023 (Project has been delayed due to multiple construction delays).
- Type of Closure: Partial Lane Closure
- Scope of Work: See Project Overview
Project Overview
PLEASE NOTE:
THIS PROJECT IS A PALM BEACH COUNTY PROJECT.
PLEASE CONTACT ALBERT HOFFMAN, AT 561-684-4180 FOR MORE INFORMATION REGARDING THIS PROJECT.
The Palmetto Park Road El Rio Canal Bridge Project, overseen by Palm Beach County Roads and Bridge, will result in a widening of the existing Palmetto Park Road El Rio Canal Bridge. Two lanes of the bridge will remain open during the construction period.
Palm Beach County Roads and Bridge is extending the eight foot (8’) shared use pathway from the end of the FDOT project (where the pathway currently terminates on the north side of Palmetto Park Road), throughout the bridge upgrade, to the western limit of Palmetto Dunes Park.
The northern part of the bridge will be demolished first and the existing eastbound lanes will be reduced to one-lane in each direction. The southern part of the bridge will be demolished later with the traveling lanes moving to the westbound lanes. At all times one lane in each direction will be open to traffic. Access to adjacent property will be allowed throughout the project. The school flashing beacon will operate during construction as well.
More Information
Visit the County's projects page at https://discover.pbcgov.org/Pages/Roads.aspx.
City of Boca Raton Projects
Intracoastal Waterways Beginning at C-15 Canal, Traveling South to Hillsboro Blvd. Bridge
- Agency: City of Boca Raton Holiday Boat Parade
- Proposed Start / End Date: Saturday, December 16, 2023
- Times of Bridge Closures:
- 6:50pm - Spanish River
- 7:20pm - Palmetto Park
- 7:30pm - Camino Real
- Scope of Parade: Intracoastal Waterways Beginning at C-15 Canal, Traveling South to Hillsboro Blvd. Bridge
Public Viewing Areas
- Red Reef Park - 1400 N Ocean Blvd
- * Wildflower Park - 551 E Palmetto Park Rd
- * Silver Palm Park - 600 E Palmetto Park Rd
*NOTE: Limited parking at Wildflower and Silver Palm Parks.
For more information, please https://www.myboca.us/1464/Holiday-Boat-Parade.
FPL Projects
No current projects.
iSIP Projects
Boca Square - iSIP
Visit the iSIP webpage for details of the project and contact information.
Boca Villas - iSIP
Visit the iSIP webpage for details of the project and contact information.
Road Work / Paving / Other Projects
No current projects.